ACE

Hoover Building

Bringing an iconic building back to life

26 case studies found - View more case studies from AECOM

Turning a derelict art-deco office block into state-of-the-art accommodation.

  • Location

    London

  • Client

    IDM Properties

  • ACE Member

    AECOM

  • Services

    Design integrator

  • Project
    Summary

  • Delivery date

    01/05/2021

  • Cost

    £10.00m

  • Delivery partners

    Interrobang, IDM

  • Project length

    1 year

Harnessing the power of their trans-disciplinary team, AECOM turned a Grade 2* listed building into modern residential property.

The headquarters of a vacuum cleaner company might not be obvious candidate for Grade 2* listing. However, after the high-profile demolition of the Firestone factory, attention turned to protecting the nearby Hoover offices from the same fate.

Left vacant for over a decade, the offices were in danger of becoming yet another disused brownfield site – so AECOM were tasked with turning them into high-spec suburban apartments fit for the 21st century.

Working with listed property comes with major challenges. However, pulling together a diverse team of construction professionals, AECOM were able to innovate novel approaches to property conversion.

For example, to install new levels between the existing floor slabs, AECOM designed a timber frame which could support the additional load whilst being hidden within period-style walls. The end result was a characterful, modern and high-quality residential property which retained the building’s original and distinctive art deco stylings.